2021 DRAKE FULL WIDENER HYDRAULIC WIDENING LOW LOADER for sale $235,000


























































![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Title | 2021 DRAKE FULL WIDENER HYDRAULIC WIDENING LOW LOADER |
Make | DRAKE |
Price | AUD $235,000 |
Listing Type | New |
Stock Number | S35 |
Refcode | TA738669 |
Starting from AUD *$235,000.00 incl GST
STANDARD FEATURES
Available in 3 x 4, 4 x 4 tyre configurations
Famous Drake design low profile gooseneck.
Level deck, high tensile steel frame
Hydraulic Suspension
Various Axle options
Axle lift/tyre change facility
Multiple position sliding skid plate
Hydraulic controlled Single ramps
Honda Petrol power pack
Spare tyre carriers
Stainless steel hydraulic tubing
Manual hydraulic widening
Grit blasted
Painted in 2 pack paint
Dunnage trays & lockable tool boxes
LED lighting
Electronic Braking System (EBS) featuring roll stability
AUXILIARY AND OPTIONAL EQUIPMENT
Extendable
Drop bed frame
Hydraulic Gooseneck
Fixed or Removable Top Deck
Container twistlock pins
Various deck lengths
Radio remote control operation
Auto Greasing systems
Diesel power pack
Hydraulic spare tyre crane
Lay flat forward ramps
Ramp props
Swing out ramps
Hydraulic landing legs
Optional Bi-Fold ramp sizes are available in 4.1m, 4.8m, and 5.65m
Various storage solutions
Related Articles
60 years of top-shelf Aussie trailers
Iconic Australian trailer manufacturer, Drake Group, hits the big 6-0 this year and Owner//Driver sat down with third generation worker in the family business Sam Drake to find out how it all began and where it’s headed. Cobey Bartels writes +more
Drake Trailers launches AG Widener low loader
Trailer manufacturer has a new trailer designed for the agricultural sector +more
Brisbane signals return of big indoor events
The Brisbane Truck Show – the biggest Australian business-to-business event in 18 months – is only a few months away +more